Guide
MOQ and lead time
There is no single MOQ across our catalogue: it depends on the product, the profile and the packing. What matters for planning is which parts of the order set the minimum and which parts set the lead time.
What sets the MOQ
Four things: the run length needed to set up the forming line for a profile, the minimum carton quantity for the packing you chose, the strip width for that diameter, and whether the item is made in-house or sourced. Standard sizes in stock profiles can be quoted in small trial quantities; special diameters, colours and printed cartons need a production run.
What is inside the lead time
- Material lead time — strip or granulate availability at the quoted index
- Production — forming, cutting, printing where required
- Packing — compression, cartons, labels, pallets
- Inspection and documents — packing list, certificate of origin where needed
- Transport — booking and cut-off for the chosen port
We confirm each of these on the order acknowledgement rather than quoting one blanket number.
How to plan a first order
Start with one or two sizes in the packing you will actually sell, ask for the carton dimensions and the compressed length, and check them against your container plan before scaling up. That is cheaper than discovering a packing mismatch on a full order.
FAQ
Common questions
If yours is not here, send it with the size list.
Can I order a mixed container?
Do you supply samples?
Next step
